脱轨器安全管理办法

(最新版)

编制人:__________________

审核人:__________________

审批人:__________________

编制单位:__________________

编制时间:____年____月____日

序言

下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大

家解决实际问题。文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢

!

并且,本店铺为大家提供各种类型的安全管理制度,如通用安全、交通运输、矿山

安全、石油化工、建筑安全、机械安全、电力安全、其他安全等等制度,想了解不

同制度格式和写法,敬请关注!

  Download tips: This document is carefully compiled by this editor. I

hope that after you download it, it can help you solve practical

problems. The document can be customized and modified after downloading,

please adjust and use it according to actual needs, thank you!

  In addition, this shop provides you with various types of safety

management systems, such as general safety, transportation, mine safety,

petrochemical, construction safety, machinery safety, electrical safety,

other safety, etc. systems, I want to know the format and writing of

different systems ,stay tuned!

脱轨器安全管理办法

为做好新线防溜工作,保证营业线行车和施工安全。进一步规范脱轨器的使用特制

定本办法。要求相关单位认真组织学习传达,并遵照执行。

  一、总则

为认真执行营业线施工安全“卡死”制度,接路局施工办、安监室通知,项目部决

定在龙津沟至小鸡街区间新线与营业线的两处交叉点附近安装脱轨器,防止新线工

程列车溜逸后影响营业线行车。

  二、概况

1、DK393+550处,新旧线交叉点坡度为12.5‰,要求在交叉点上坡方向300米左右设

置脱轨器,现场实际设置里程为DK393+800,左、右线脱轨器编号分别为:322#、3

29#。

2、DK397+450处,新旧线交叉点坡度为12.5‰,要求在交叉点上坡方向300米左右

设置脱轨器,现场实际设置里程为DK397+850,左、右线脱轨器编号分别为:317#

、316#。

  三、脱轨器使用安全保证措施

1、脱轨器的日常管理归属整道队,要求对装卸螺杆进行涂油,确保脱轨器装卸自

如。

2、做好脱轨器安装前的检查,保证状态良好,设置时要求在左、右线的右股分别

各设一套,红牌正面朝向新线内方。

3、整道队相应片区施工负责人(DK393+800由***负责、DK397+850由***负责)安

排做好巡查工作,要求早晚各巡查一次,并做好记录。

3、脱轨器钥匙由整道队相应片区施工负责人亲自管理,脱离轨器的设置和拆除原

则上遵循“谁使用,谁负责”,即工程列车配合的施工单位联系整道队,办理借用

登记后取钥匙,施工完后及时归还,同时片区负责人亲自到现场核对使用后的安装

完好状况,做好交接和核查记录。

4、运输队应立即组织传达文件精神,做到每名乘务员都清楚脱轨器安装地点和行

车安全注意事项。

5、整道队、无缝线路队、运输队应加强信息的沟通,行车前联系确认好脱轨器的

拆卸和安装工作,避免延误施工。

6、司乘人员(含调车组)值乘列车通过脱轨器设置点时,必须认真了望确认,若

因盲目臆测行车,造成列车脱线,项目部将根据《安全质量奖惩办法》进行考核。

  四、其他要求

  1、在脱轨器拆下时要有专人看管,避免发生村民盗窃或配件丢失现象。

  2、安装必须牢固,要求钢轨锁紧固无松动,红牌牢固无倒伏。

  3、整道队按要求做好日常巡查记录并存档。

二○一一年三月十二日